Sunday, 13 March 2016

Production log 5

What Have You Contributed This Week?

This week collectively we was all editing the music video. As in the previous week we knew the style that we wanted to create, we could now move forward and edit everything a lot quicker. My job this week was to really make a big contribution to the edit of the music video. As it was my original idea and i have had the idea of how i wanted the aesthetics to look like.












How does this fit in with your production schedule/ job roles/ overall ideas of the project?

In terms of our production schedule we are a little behind. We are editing to a good pace and standard, which we are pleased with. However we know that we will need to go and re-shoot some things and we still have some large gaps to edit. But we are confident that everything will be done on time and we will meet the deadlines with a high quality piece of work.







Were there any problems?

This week we didnt have any problems, we used our time wisely and have sorted out the dates to re-shoot some scenes already. Then we used all the class time available to edit as much as possible. We feel that we have a good schedule and although we have had problems in the past, we have worked well to overcome them and get back on top of everything after a couple dilemmas.





What are your plans for the following week?

As this week we used all of the class room time to edit the video, we wanted to finish this week by re-shooting what we needed. We are then going to continuously edit for the next week and meet the deadline of Monday 14th. Next week will be about polishing the video up and making it look professional with some colour correction and checking that the cuts are clean.